EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (678)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
-
Fogged cylinders and...
-
Silicone Baffling
-
Baffling and Paint Prep
-
Baffling
-
Baffling
-
Baffling ans wiring
-
Baffle seals
-
Baffle Seals
-
Baffle seals
-
Baffles
-
Engine Baffle Seals
-
Baffling
-
Wiring
-
Wiring
-
EGT Probes, Ignition...
-
Exhaust
-
Exhaust and securing...
-
Baffles
-
Air Box
-
Engine
-
Baffling and Oil Dip...
-
Cowling
-
Oil door and cowling...
-
Oil Access Door
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Cowling
-
Throttle and Mixture...
-
Throttle Cable
-
Baffles and windshield
-
Engine wiring
-
Prop flange and...
-
Coanda Fairing and...
-
Ignition wiring
-
EGT Probes and Airbox
-
CHT Probes and...
-
Airbox
-
Airbox
-
Airbox and Baffling
-
Baffling
-
Baffling
-
Front baffling
-
Baffles
-
Baffles
-
Baffling
-
Baffling
-
Baffling
-
Baffling
-
Baffling
-
Baffling
-
Baffling
-
Fuel and pressure lines
-
Wiring
-
Wiring
-
Wiring
-
Engine accessories
-
Engine Accessories
-
Starter ring gear...
-
Engine accessories
-
Engine accessories
-
Engine Install
-
LSE Ignition
-
Engine Buildup
-
Engine Accessories
-
Engine Accessories
-
Engine prep
-
Engine Accessories
-
Firewall wiring
-
Wiring
-
Firewall Accessories
-
ANL Fuse
-
Pressure Manifold
-
Wiring
-
Cabin Heat Box and...
-
Engine controls and...
-
Engine Delivery Day
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (4)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (51)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1990
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Dec 15, 2022
EGT Probes and Airbox
- (3.5 hours)
Category: Engine
Marked and drilled/deburred exhaust stacks for EGT probes. Needed to drill out to #29 drill size for perfect fit of probes. Clamped probes and trimmed hose clamps. Wired probes to appropriate leads and tested readouts on G3X. All readings normal. Applied heat to stacks with heat gun and all responded correctly. Finished fabricating airbox inlet tabs. Ready to install.
Airbox Completed (1).jpg
Airbox Completed (2).jpg
Airbox Completed (3).jpg
Airbox Completed (4).jpg
EGT Probe Initial Install (1).jpg
EGT Probe Initial Install (2).jpg
EGT Probe Initial Install (3).jpg
EGT Probe Initial Install (4).jpg
EGT Probe Initial Install (5).jpg
EGT Probe Initial Install (6).jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.